Our Brothers in Auckland have a sizeable building underway at Millwater! It was a week of early mornings and beautiful sunrises for our build team who are tracking well through the structural concrete works. The podium stage 1 concrete pour was finished this week and Brad (Project Manager), Colin and Ash (Site Managers), along with Sullivan Hall Engineers and Julian Guthrie Architects, are getting ready for the timber framing for the townhouses in the coming weeks.

Complex structural and architectural design components coupled with tight timeframes make Millwater Central Terraces are a challenging but memorable project for all parties involved. This build was commissioned by Broadway Property Group and is scheduled for completion in early 2017.

The Millwater Central Terraces are a mixed use development which incorporates 37 terraced townhouses over 2 levels, 14 ground-level retail units, secure underground parking, and mid-level podium structure with landscaped courtyards. Once finished, this development will complement the Millwater Central retail centre creating benefits for both residents and retailers by expanding the variety and quality of amenities and strengthening the local consumer base.

Authour: Craig Hopkins

Type: Project Updates

Published:

Tags: ,

cook-brothers-construction-millwater-pour

,

Comments are closed.